There are now two credible current-generation nodes for serious AI workloads, not one. Most teams still default to whichever name is trending in their feed rather than running the actual math against their own workload, and on dedicated bare metal, where the node you pick is the node you're running for the length of the contract, that's an expensive way to make a GPU infrastructure decision.

The short version: H200 is a memory upgrade on proven Hopper silicon. B300 is a new architecture built around FP4 precision and a much larger memory pool. Which one is right depends less on which is newer and more on what your workload is actually bottlenecked by.

Same die, different memory subsystem

H200 keeps the same GH100 compute die as the H100, according to NVIDIA's own datasheet, so peak tensor throughput is unchanged. What it swaps in is 141GB of HBM3e running at 4.8TB/s, up from the H100's 80GB at 3.35TB/s. Every H200 gain over the H100 traces back to memory, not compute, which is why NVIDIA's own H200 launch benchmarks put the inference gain at up to 1.9x on large language models, a number that narrows considerably for workloads that aren't already memory-bandwidth-bound.

B300, officially Blackwell Ultra, is a different generation entirely. NVIDIA's published Blackwell Ultra specifications put it at 270GB of HBM3e per GPU, nearly twice the memory of the H200, and NVIDIA's HGX B300 datasheet lists 7.7TB/s of memory bandwidth per GPU, with native FP4 tensor cores that neither the H100 nor the H200 support at all. On FP8, the same datasheet lists the HGX B300 at 9 PFLOPS per GPU with sparsity, against about 4 PFLOPS for the H200, a gap of a little over 2x. On FP4, it isn't a multiple at all, it's a capability the H200 simply doesn't have.

When 141GB and air cooling are enough

If your model fits comfortably inside 141GB and the workload is memory-bandwidth-bound rather than compute-bound, long-context inference, large-batch serving, training in the sub-70B range, the H200 remains the more pragmatic of the two on three separate fronts.

It's air-cooled at 700W SXM, which means it drops into existing Hopper-based infrastructure without a cooling redesign. Pricing has also matured as Hopper-generation supply has scaled, with reserved and committed-use rates well below on-demand list price for longer commitments. And it's a known quantity. The software stack, the failure modes, and the performance characteristics are well understood after nearly two years in production, which matters more than it sounds like it should when something breaks at 2am.

1Legion doesn't rent H200 servers. For this profile we offer the HGX B200: 180GB of HBM3e per GPU at 7.7TB/s against the H200's 141GB at 4.8TB/s, with native FP4, at up to 1,000W per GPU, a power level OEMs build into air-cooled servers. If the model fits in 96GB per GPU, an RTX PRO 6000 Blackwell server is the other option.

When 270GB and native FP4 change the math

The B300's case is specific, not general, and it's the same case whether the node sits in a hyperscaler region or on dedicated bare metal. For models in the 70B-plus range, its 270GB of memory holds a full model in FP16 with headroom to spare, something the H200 can't do without careful memory management or a quantization tradeoff it wasn't necessarily designed around. For inference workloads built on FP4 quantization, reasoning models and mixture-of-experts architectures especially, the B300's native FP4 tensor cores deliver throughput the H200 has no path to at any price. And for trillion-parameter or long-context agentic workloads where the entire model state needs to stay resident in memory, the B300's memory ceiling settles the question before compute even enters the conversation.

1,100W air or 1,400W liquid: what deployment takes

Memory and throughput numbers get the attention. The deployment requirements are where the decision gets real. NVIDIA's Blackwell Ultra datasheet lists the HGX B300 at up to 1,100W per GPU, a power level OEMs ship in air-cooled servers, and the GB300 NVL72 at up to 1,400W per GPU in a fully liquid-cooled rack. The higher power bin buys roughly 10 percent more peak throughput, 10 PFLOPS of FP8 with sparsity against 9, at the cost of direct liquid cooling. H200 tops out at 700W and deploys air-cooled in standard SXM configurations at full spec, no bin trade-off involved. Either way, a B300 deployment draws far more power per GPU than an H200, and that carries infrastructure cost and complexity, power delivery, cooling capacity, facility requirements, that an H200 deployment on existing Hopper infrastructure simply doesn't.

On 1Legion, that facility work is part of the service. Our HGX B300 servers are air cooled, on the OEM's recommendation at cluster scale, in data centers chosen for their contracted power per rack, and the GB300 NVL72, which needs direct-to-chip liquid cooling, is available by reservation.

Supply is the other constraint worth weighing before the spec sheet. Lead times for current-generation systems such as the B300 change from quarter to quarter, so confirm them directly with a provider rather than planning against a published number: at 1Legion, HGX B300 allocation is open and the delivery schedule is set in your proposal. If your timeline is measured in weeks rather than quarters, that constraint alone can settle the decision regardless of what the throughput numbers say.

Match the node to the bottleneck, not the launch date

Start with what's bottlenecking the workload today, not what the roadmap might need eighteen months from now. If the model fits in 141GB and the workload is bandwidth-bound rather than FP4-bound, H200-class hardware delivers comparable real-world throughput at lower deployment complexity, and in 1Legion's catalog that profile maps to the HGX B200. If the model exceeds what 141GB can hold comfortably, or the workload is built around FP4 quantization for reasoning or MoE architectures, the B300's memory ceiling and throughput advantage justify the added power, cooling, and lead-time cost.

The wrong move, in either direction, is picking based on release date instead of running the workload math first. On dedicated bare metal, that decision holds for the length of the contract, 36 to 60 months at 1Legion, which is exactly why it's worth getting right before signing rather than after.

Talk to an engineer about which node actually fits your workload, not just which one launched most recently.