Space and power, or servers: we add customers and operations
Track A: you have space and power, and we bring hardware, customers and operations. Track B: you have hardware, and we bring colocation, 24/7 operations, remote hands, monitoring and customers.
1Legion's GPU colocation and operations program has two tracks. In Track A, you have data center space and power, and we bring hardware, customers and operations. In Track B, you have hardware or are becoming a GPU cloud provider, and we bring colocation space in our partner facilities, 24/7 operations, remote hands, monitoring and customers.
Choose your track
Choose the track by what you already have: a site with power, or hardware that needs a site, operations and customers.
Track A: you have space and power
For data center owners and operators. We bring hardware, customers from our pipeline and operations. Your facility must meet our partner requirements, summarized on this page.
Track B: you have hardware
For hardware owners and companies becoming GPU cloud providers. We bring colocation space in our partner facilities, 24/7 operations, remote hands, monitoring and customers, under your brand or ours.
Track B is how a company can become a GPU cloud provider without building its own facility or operations team: you bring the hardware and, if you want, the brand, and we run the neocloud operations behind it. If you own or finance GPU servers as an investment rather than to run a cloud, operate your cluster is the closer fit.
What an AI cluster needs from your data center
The key number is the contractual maximum kW per rack, because we plan each HGX B300 GPU node at about 14 kW.
| Item | Planning power |
|---|---|
| HGX B300 GPU node | About 14 kW, working assumption |
| CPU node | 1.0 kW |
| Control plane node | 0.5 kW |
| Storage node | 1.3 kW |
| Network | 5 percent of GPU load |
With those figures, the reference clusters in our delivery specification come to the estimated IT loads below.
| Item | 64 nodes | 128 nodes | 288 nodes |
|---|---|---|---|
| GPU nodes (8 GPUs each) | 64 | 128 | 288 |
| GPUs | 512 | 1,024 | 2,304 |
| CPU nodes | 24 | 48 | 108 |
| Control plane nodes | 6 | 6 | 6 |
| Storage, appliance option (usable) | 512 TB | 1,024 TB | 2,304 TB |
| Storage, storage-node option | 9 nodes | 17 nodes | 38 nodes |
| Estimated IT load | about 0.98 MW | about 1.95 MW | about 4.39 MW |
We deploy HGX B300 air cooled today, on the OEM's recommendation at cluster scale. For GB300 NVL72 and later platforms, we need a path to direct-to-chip liquid cooling.
What we ask of a facility
Before we place a cluster, a facility must meet the public summary of our data center partner requirements (1LG-DC-REQ-2026-001 Rev 2), shown with evidence rather than claims.
| Area | What we ask for |
|---|---|
| Power | A contractual maximum kW per rack; dual A and B power paths to every rack; concurrent maintainability on power and cooling; generator and UPS autonomy |
| Cooling | Air cooling for HGX B300 today; a path to direct-to-chip liquid cooling for GB300 NVL72 and later |
| Evidence | Tier III design documentation, Uptime Institute certification stated precisely, TIA-942, EN 50600, SOC 2 and ISO 27001, with reference numbers, releasable under NDA |
| Space | Contiguous space in a private cage or a dedicated hall |
| Staffing | 24/7 on-site staffing in place before go-live; remote hands within 30 minutes |
| Incidents and maintenance | Facility incident notice within 15 minutes, then hourly updates; 14 days' notice of risky maintenance |
| Connectivity | At least two independent carriers with 100 Gb/s circuits, physically diverse paths, BGP support, DDoS options, IPv6 and an out-of-band network |
| Telemetry | Power per rack and per feed, cooling, thermal and leak detection, with 12 months of alarm history |
| Commercial | 4 to 5 year terms aligned to the customer contract; a ramp that follows contract execution and hardware delivery; expansion rights; a right of first refusal on adjacent space |
The data center partner requirements summary is on our downloads page, so you can check your site before a first call.
Facility figures next to our customer commitments
| What we ask of the facility | What we commit to our customers |
|---|---|
| Remote hands within 30 minutes | Facility engineering or remote hands engaged within 45 minutes, at any hour |
| Incident notice within 15 minutes, then hourly updates | Incident acknowledged within 15 minutes, updates at least every 60 minutes |
| 14 days' notice of risky maintenance | At least 7 days' notice of high-risk maintenance |
| 12 months of alarm history | 12 months of incident and state history |
The full list is on our operating commitments page.
How the commercial side works
Colocation is resold per kW on multi-year terms, and operations are paid as a share of rental revenue, a fixed fee or a mix, agreed per partner.
Track A: your facility
We ask for terms of 4 to 5 years aligned to the customer contract. The ramp follows contract execution and hardware delivery, and we ask for expansion rights and a right of first refusal on adjacent space.
Track B: your hardware
Colocation in our partner facilities is resold per kW on multi-year terms. Operations, meaning 24/7 operations, remote hands and monitoring, are agreed per partner as a share of rental revenue, a fixed operating fee or a mix. The service, including customers from our pipeline, can run under your brand or ours.
Every price comes in a written proposal. We do not publish colocation or operating rates.
What each side brings
Each track divides the work between you and us as follows.
| Track A: you have space and power | Track B: you have hardware | |
|---|---|---|
| Suits | Data center owners and operators | Hardware owners and companies becoming GPU cloud providers |
| You bring | Space, power, cooling, connectivity and 24/7 on-site staff that meet our partner requirements | GPU servers you own or plan to buy, and your brand if you want to use it |
| 1Legion brings | Hardware, customers from our pipeline and operations | Colocation in our partner facilities, 24/7 operations, remote hands, monitoring and customers |
| Commercial basis | 4 to 5 year terms aligned to the customer contract | Colocation per kW on multi-year terms; operations by revenue share, fee or a mix |
| To start, send | Site location, power available in MW, contractual kW per rack, cooling and ready-for-service date | GPU model, number of servers and where the hardware is today |
How a partnership starts
Five steps take a site or a set of servers from a first message to customers in production.
Send the basics
Track A: site location, power available in MW, contractual kW per rack, cooling and ready-for-service date. Track B: GPU model, number of servers and where the hardware is today.
First call
We go through the site or the hardware, the track that fits and the commercial model.
Evidence
For a site, you share the evidence behind our partner requirements under NDA, from Tier III design documentation to SOC 2 and ISO 27001 reference numbers.
Written agreement
We agree terms in writing: facility terms of 4 to 5 years for Track A, or colocation per kW and an operations model for Track B.
Deployment and customers
We rack and burn in the hardware, run it 24/7 and bring customers from our pipeline.
Talk to the partnerships team
Send the basics about your site or your hardware, and we will arrange a first call. If you bring hardware rather than a site, choose that partner type in the form.
Questions partners ask
What rack density do you need?
We plan each air-cooled HGX B300 GPU node at about 14 kW, so the contractual maximum kW per rack decides how many nodes each rack holds. It is the key number for us.
Do you need liquid cooling?
Not for HGX B300, which we deploy air cooled today. For GB300 NVL72 and later platforms, we need a path to direct-to-chip liquid cooling.
What evidence do you ask a facility for?
Evidence, not claims: Tier III design documentation, Uptime Institute certification stated precisely, TIA-942, EN 50600, SOC 2 and ISO 27001, with reference numbers, releasable under NDA.
How is colocation priced?
Per kW, on multi-year terms, in a written proposal. We do not publish rates.
Can we sell under our own brand?
Yes, on Track B. We provide colocation, 24/7 operations, remote hands, monitoring and customers, under your brand or ours.
What term do you sign with a facility?
4 to 5 years, aligned to the customer contract, with a ramp that follows contract execution and hardware delivery, expansion rights and a right of first refusal on adjacent space.
Send us your site or your hardware
Start with power, rack density, cooling and a ready-for-service date, or the servers you own.