Our HGX B300 delivery specification
Every HGX B300 proposal we write starts from one document, 1LG-DEL-SPEC-2026-001. This is its public edition: what each cluster includes, what we prefer, and how a change for you is recorded.
This is the public edition of our HGX B300 cluster specification, document 1LG-DEL-SPEC-2026-001, dated September 24, 2026. It is the baseline for every HGX B300 proposal we write: the reference cluster sizes, the nodes, storage and networks, and the operating commitments that come with the cluster. Anything that differs for your cluster appears in your proposal as a numbered deviation.
How the specification works
The specification sets a baseline, and your proposal records every change from it as a numbered deviation. Each item in the document is either Required or Preferred. On this page, minimums are written as "at least" or "minimum", and preferred options are marked "preferred".
Required
Part of the baseline for every HGX B300 proposal. If your cluster needs something different, the change is listed in your proposal as a numbered deviation.
Preferred
The option we prefer where the document allows more than one, such as NVIDIA ConnectX-8 for the backend network cards.
Numbered deviation
A customer-specific change, written into your proposal with its own number, so your engineers and procurement team can check each difference from this baseline before you sign.
Reference cluster sizes
The specification defines three reference clusters, of 64, 128 and 288 GPU nodes, and each size includes the CPU nodes, control plane and storage that go with it.
| Item | 64 nodes | 128 nodes | 288 nodes |
|---|---|---|---|
| GPU nodes (8 GPUs each) | 64 | 128 | 288 |
| GPUs | 512 | 1,024 | 2,304 |
| CPU nodes | 24 | 48 | 108 |
| Control plane nodes | 6 | 6 | 6 |
| Storage, appliance option (usable) | 512 TB | 1,024 TB | 2,304 TB |
| Storage, storage-node option | 9 nodes | 17 nodes | 38 nodes |
| Estimated IT load | about 0.98 MW | about 1.95 MW | about 4.39 MW |
Every reference size has six control plane nodes, and the specification sets the control plane at 6 nodes per 2,304 GPUs. The two storage rows correspond to the two storage options described below: usable capacity for an appliance, or a node count for storage nodes.
Planning power
The estimated IT load is built from these planning figures:
| Item | Planning figure |
|---|---|
| GPU node | About 14 kW (working assumption) |
| CPU node | 1.0 kW |
| Control plane node | 0.5 kW |
| Storage node | 1.3 kW |
| Network | 5 percent of GPU load |
For the 64-node size, that is 64 GPU nodes at about 14 kW each, plus 24 CPU nodes, 6 control plane nodes, 9 storage nodes and network at 5 percent of GPU load: about 0.98 MW. We plan facility power from these figures, and the contractual maximum kW per rack is the key number we ask of a facility. Our data centers page lists the rest of what we ask.
Compute nodes
Besides storage, a cluster has three kinds of node: GPU nodes that run your workloads, CPU nodes for the services around them, and a control plane that runs the cluster itself.
GPU node
| Item | Specification |
|---|---|
| Platform | NVIDIA HGX B300, 8 GPUs |
| GPU memory | 270 GB HBM3e per GPU, 2.1 TB per node, as NVIDIA lists the HGX B300 |
| Cooling | Air cooled, on the OEM's recommendation at cluster scale |
| CPU | At least 128 vCPUs |
| System memory | 3 TB preferred; at least 240 GB per GPU (1.92 TB) |
| Boot drives | 2 x 1 TB NVMe, mirrored (preferred) |
| Local data storage | At least 9.2 TB raw NVMe, more than 4 x GPU memory |
| Backend NIC | 800 Gb/s per GPU, as 1 x 800, 2 x 400 or 4 x 200 Gb/s; NVIDIA ConnectX-8 preferred |
| Frontend NIC | NVIDIA BlueField-3; 2 x 400 Gb/s preferred, 2 x 200 Gb/s minimum |
- Memory. At 270 GB of HBM3e per GPU, each node holds 2.1 TB of GPU memory. System memory of at least 240 GB per GPU gives the host room to stage data and model weights for the GPUs.
- Local storage. Raw NVMe of at least four times the node's GPU memory keeps datasets, checkpoints and model files next to the GPUs.
- Network cards. The backend NIC gives each GPU 800 Gb/s into the east-west fabric, in one of three port layouts. The BlueField-3 frontend NIC connects the node to the north-south network.
- Cooling. The nodes are air cooled because the OEM recommends air at cluster scale.
CPU nodes
| Item | Specification |
|---|---|
| Role | Services around the GPUs: serving, routing, batch |
| Sizing | At least 6 hardware threads and 24 GB of memory per GPU in the cluster |
| Processor | x86, at least 128 vCPUs, base clock above 3 GHz |
| Preferred CPU | AMD EPYC 9565 or 9575F |
| Memory | 4 GB per thread |
| Frontend NIC | NVIDIA BlueField-3 |
CPU nodes run the work around the GPUs, such as serving, routing and batch jobs, so GPU nodes are not tied up with it. Because they are sized per GPU, they grow with the cluster: 512 GPUs need at least 3,072 hardware threads, which is what 24 nodes of 128 vCPUs provide.
Control plane
| Item | Specification |
|---|---|
| Nodes | 6 per 2,304 GPUs, spread over two racks |
| Processor | 32 vCPUs above 3.65 GHz; AMD EPYC 9175F preferred |
| Memory | 128 GB |
The control plane runs the cluster's management services. Its six nodes are spread over two racks, so no single rack holds all of them.
Storage
You choose one of two storage designs: a vendor-managed appliance (option A) or storage nodes for your own storage software (option B).
| Option A: appliance | Option B: storage nodes | |
|---|---|---|
| What it is | A vendor-managed appliance from VAST Data, WEKA or DDN, the vendor you prefer | Storage nodes for your own storage software |
| Capacity | At least 1 TB usable per GPU | At least 3 TB raw per GPU |
| Drives | Vendor-supported design | 30.72 TB NVMe PCIe 5.0; self-encrypting drives supported |
| At the reference sizes | 512, 1,024 or 2,304 TB usable | 9, 17 or 38 nodes, with a minimum of 9 |
With option A, the appliance service in the specification includes a vendor-supported design with 24/7 escalation, committed throughput and latency per tier, visible usage and quotas, and tested recovery. Option B suits teams that already run their own storage software and want raw capacity under it.
Cluster and edge networks
Every cluster has its own east-west fabric for traffic between GPUs and its own north-south network, and at the edge it gets redundant transit, DDoS scrubbing, NAT and dedicated public addresses.
East-west fabric
| Item | Specification |
|---|---|
| Topology | Rail-optimized, fully non-blocking |
| Bandwidth per GPU | 1 x 800 or 2 x 400 Gb/s planes |
| Switching, preferred | NVIDIA Spectrum-X or Broadcom Tomahawk 6 |
| Switching, accepted | NVIDIA Quantum InfiniBand or Broadcom Tomahawk 5 |
| Tenancy | Dedicated to one customer |
Rail-optimized means the GPU in each position of every node connects to its own set of switches, its rail, which keeps the paths between matching GPUs short. Fully non-blocking means the fabric can carry every GPU's full bandwidth at the same time, with no oversubscription between switch layers.
North-south network
| Item | Specification |
|---|---|
| Bandwidth per node | 400 Gb/s preferred, 200 Gb/s minimum |
| Storage leaves | No oversubscription |
| GPU leaves | Oversubscription below 4:1 |
| Transport | RoCEv2 capable |
| MTU | 9000 |
| Tenancy | Dedicated |
Oversubscription is the ratio between the bandwidth a leaf switch offers its nodes and the bandwidth of its uplinks. Storage leaves have none, so reads and checkpoint writes are not held back by the uplinks, and GPU leaves stay below 4:1. RoCEv2 carries RDMA over this Ethernet network, and an MTU of 9000 (jumbo frames) cuts per-packet overhead on large transfers.
Edge and internet services
| Item | Specification |
|---|---|
| Transit | Two independent providers at 100 Gb/s per circuit, on physically diverse paths |
| Routing | eBGP with BFD; failover within a minute |
| Edge routers | Two, redundant, on A and B power |
| Edge ACLs | Set to your rules; changes within one business day |
| DDoS protection | Volumetric layer 3 and 4 scrubbing from an established provider, activated through BGP within 5 minutes, at least 1 Tb/s |
| NAT and egress | Redundant HA pair, at least 10 million concurrent sessions, dedicated SNAT addresses (typically four) |
| Public service addresses | Dedicated (typically eight); you can advertise VIPs over BGP; failover within 5 seconds; IPv6 dual stack |
| Your IP space and ASN | The edge can advertise your prefixes and your ASN; RPKI ROAs honored; BGP session authentication |
| Network telemetry | NetFlow v9 or IPFIX from both edge routers to your collector |
- Transit and routing. Two independent providers on physically diverse paths mean that one cut cable or one provider's outage is not a single point of failure. BFD detects a failed link quickly, and eBGP fails over to the other provider within a minute.
- Edge routers. Two redundant routers on A and B power, so the edge does not depend on one router or one power feed.
- Edge ACLs. The access control lists at the edge follow your rules, and we make changes within one business day.
- DDoS protection. Volumetric attacks at layers 3 and 4 are diverted through BGP to an established scrubbing provider. Scrubbing is activated within 5 minutes, with at least 1 Tb/s of capacity.
- NAT and egress. Outbound traffic leaves through a redundant pair that holds at least 10 million concurrent sessions, from SNAT addresses only you use, so partners can allow-list your traffic.
- Public service addresses. Typically eight dedicated addresses for your services. You can advertise virtual IPs over BGP, failover happens within 5 seconds, and IPv6 runs dual stack.
- Your IP space and ASN. If you hold your own prefixes and ASN, the edge can advertise them. We honor your RPKI route origin authorizations (ROAs), which tell other networks which ASN may originate your prefixes, and BGP sessions are authenticated.
- Network telemetry. Both edge routers send NetFlow v9 or IPFIX flow records to your collector, so you see your own traffic.
Operations after handover
The specification also covers what happens around handover: a burn-in before it, and written operating commitments after it.
Before handover, every cluster passes NVIDIA's hardware validation for inference providers, tests HW-1 to HW-5, and the results come to you in an acceptance report. Our burn-in and acceptance page explains what each test proves.
After handover, section 15 of the specification sets out how we run the cluster, starting with these commitments:
| Commitment | Figure |
|---|---|
| Incident acknowledged and an incident commander assigned | Within 15 minutes |
| Updates while an incident is open | At least every 60 minutes |
| Network operations engaged, at any hour | Within 15 minutes |
| Facility engineering or remote hands engaged | Within 45 minutes |
| Written postmortem after a customer-impacting incident | Within 7 days |
| Notice before high-risk planned maintenance | At least 7 days |
The full list, including the inventory, change management and hardware fault handling, is on our operating commitments page. Out-of-band hardware telemetry comes from the BMC through Redfish, with network and facility telemetry where available. Operational telemetry is kept for at least 30 days, and incident and state history for at least 12 months.
Download the specification
The specification sheets are available as PDF files, for your engineers and procurement team to review and share.
- NVIDIA HGX B300 server specification sheetPDF. GPU node, CPU and control plane nodes, network interfaces. Download PDF
- HGX B300 reference clusters: 64, 128 and 288 nodesPDF. Cluster sizes, storage, fabric and edge network. Download PDF
- Data center partner requirements, summaryPDF. Power, cooling, certification evidence, staffing and connectivity. Download PDF
- How 1Legion contracts workPDF. Terms, onboarding, billing and what is included. Download PDF
Every document we publish is on our downloads page. To discuss a configuration against this specification, talk to an engineer.
Questions buyers ask
What is 1LG-DEL-SPEC-2026-001?
It is 1Legion's HGX B300 delivery specification, dated September 24, 2026, and the baseline for every HGX B300 proposal we write. This page is its public edition.
Can the specification change for our cluster?
Yes. Customer-specific changes are written into your proposal as numbered deviations, so you can see every point where your cluster differs from the baseline.
Are the GPU nodes air cooled or liquid cooled?
HGX B300 nodes are air cooled, on the OEM's recommendation at cluster scale. We ask our facilities for a path to direct-to-chip liquid cooling for GB300 NVL72 and later systems.
Which storage can we choose?
A vendor-managed appliance from VAST Data, WEKA or DDN with at least 1 TB usable per GPU, or storage nodes for your own storage software with at least 3 TB raw per GPU and a minimum of 9 nodes.
Can we bring our own IP addresses and ASN?
Yes. The edge can advertise your own prefixes and your ASN, honors your RPKI ROAs and uses BGP session authentication.
Does the specification cover GPUs other than the HGX B300?
No, it covers HGX B300 servers and clusters. For other GPU servers, your written proposal sets out the configuration.
Tell us what you need to run.
Share the hardware, the number of servers, the term and the start date. You receive a written proposal built on our delivery specification.