On requestAda Lovelace

NVIDIA L40S

Eight Ada Lovelace L40S GPUs with 48 GB of GDDR6 each, 384 GB per server, for inference of models that fit in 48 GB alongside rendering, 3D graphics and video, configured on request.

GPUs per server
8
Memory per GPU
48 GB GDDR6
FP8 per GPU
733 TFLOPS dense
Power per GPU
350 W

Specifications

Contracts run 36 to 60 months. Every price is given in a written proposal.

GPU
GPU
ArchitectureNVIDIA Ada Lovelace
Memory48 GB GDDR6 with ECC
Memory bandwidth864 GB/s
CUDA cores18,176
Tensor Cores568, fourth generation
RT Cores142, third generation
FP8 Tensor733 TFLOPS dense, 1,466 TFLOPS sparse
FP16 and BF16 Tensor362.05 TFLOPS dense, 733 TFLOPS sparse
TF32 Tensor183 TFLOPS dense, 366 TFLOPS sparse
INT8 Tensor733 TOPS dense, 1,466 TOPS sparse
FP3291.6 TFLOPS
RT Core performance212 TFLOPS
Media engines3 NVENC and 3 NVDEC, with AV1 encode and decode
InterconnectPCIe Gen4 x16, 64 GB/s; no NVLink
VirtualizationNVIDIA vGPU supported; MIG not supported
Power per GPU350 W
Form factorDual slot, 4.4 in x 10.5 in, passive cooling
Server as delivered
Server as delivered
GPUs per server8
GPU memory per server384 GB (8 x 48 GB)
GPU board power per server2,800 W (8 x 350 W)
CPU, system memory, storage and networkConfigured to your requirements and confirmed in your proposal

Typical workloads

  • Inference of models that fit in 48 GB per GPU
  • Rendering and 3D graphics
  • Video processing with AV1 encode and decode
  • Mixed AI and graphics on one fleet

Figures from NVIDIA product documentation: NVIDIA L40S, NVIDIA press release, L40S (August 2023).

Rent dedicated servers with eight NVIDIA L40S GPUs for inference, rendering and video. L40S servers are available on request: we source and configure them to your requirements, on 36, 48 or 60 month contracts.

Who the L40S is for

The L40S is NVIDIA's general-purpose data center GPU on the Ada Lovelace architecture, built to run AI and graphics on the same hardware. NVIDIA calls it a universal data center GPU.

It suits teams that serve models fitting in 48 GB per GPU, render or run 3D workloads, and process video, often on one set of servers. Each GPU has 48 GB of GDDR6 with ECC, 384 GB per server, in a passively cooled card built for server airflow. Because the same card renders and serves models, you can move servers between graphics and inference work as your mix changes, without a second set of hardware.

What it does well

FP8 inference

733 TFLOPS of dense FP8 per GPU (1,466 TFLOPS with sparsity) and 362 TFLOPS of dense BF16 or FP16, from 568 fourth-generation Tensor Cores.

Graphics and rendering

142 third-generation RT Cores rated at 212 TFLOPS, 18,176 CUDA cores and 91.6 TFLOPS of FP32.

Video

Three NVENC and three NVDEC engines per GPU, with AV1 encode and decode, 24 encoders per server.

Power

350 W per GPU in a dual-slot card, 2,800 W of GPU board power per 8-GPU server.

Memory bandwidth is 864 GB/s per GPU. The L40S supports NVIDIA vGPU software but not MIG, and its GPUs connect over PCIe Gen4 x16 at 64 GB/s, with no NVLink. It suits work that runs on one GPU, or splits across two or three over PCIe, better than models that need constant GPU-to-GPU traffic.

Configuration as delivered

L40S servers are configured to your requirements and confirmed in your proposal: CPU, system memory, local NVMe and network. Tell us whether the servers will run inference, rendering or both, and we size host memory and storage around that mix.

Every server is burned in before handover, and the results go into an acceptance report. Our burn-in and acceptance page explains how that replaces a trial.

How renting works

L40S servers are available on request. Tell us the number of servers, the term and the start date, and we confirm the configuration and delivery schedule in a written proposal.

Contracts run 36, 48 or 60 months, and longer terms carry lower rates. The company that will run the servers completes three onboarding forms before signing. You pay a down payment at signing, then one fixed monthly rate for the full term, with no egress fees. Our how to buy page covers each step, and our data centers page lists where servers run.

Workloads and alternatives

Size by memory: weights, KV cache and headroom must fit in 48 GB per GPU. A 30B-parameter model in FP8 fits on one L40S; a 70B model in FP8 needs about 70 GB for its weights alone, so it spans two GPUs.

Leave room for the KV cache, which grows with context length and concurrency. For a 70B model it costs about 0.33 MB per token, or about 2.7 GB for one 8K-token sequence, so two L40S GPUs holding 70 GB of FP8 weights keep about 26 GB for cache and headroom.

Our AI inference page covers serving on dedicated servers, and media and entertainment covers rendering and video. LLM inference on dedicated bare metal and 70 GB of weights, four GPUs explain the sizing rule.

If you need more memory per GPU or FP4, the RTX PRO 6000 Blackwell has 96 GB per GPU, with allocation open in Montreal. For graphics-led work with 48 GB and NVLink bridges between pairs of cards, see the RTX A6000.

Questions buyers ask

L40S or RTX PRO 6000 Blackwell: which should we rent?

The RTX PRO 6000 Blackwell has twice the memory per GPU (96 GB against 48 GB), FP4 support and allocation open in Montreal. The L40S fits work that runs comfortably in 48 GB per GPU.

What fits in 48 GB?

A model whose weights, KV cache and headroom fit in 48 GB. A 30B-parameter model in FP8 needs about 30 GB for weights and fits on one GPU; a 70B model in FP8 needs about 70 GB, so it spans two.

Does the L40S support MIG or NVLink?

Neither, according to NVIDIA. The L40S supports NVIDIA vGPU software, and its GPUs connect over PCIe Gen4 x16.

How soon can we get L40S servers?

L40S servers are available on request. Your written proposal states the delivery schedule for the quantity you need.

What contract terms are available?

36, 48 or 60 months, with lower rates for longer terms. You pay a down payment at signing, then one fixed monthly rate for the full term, with no egress fees.

Rent L40S servers on 36 to 60 month terms.

Share the hardware, the number of servers, the term and the start date. You receive a written proposal built on our delivery specification.